С»ÆѼÊÓƵ

Back
Insights
Employees sitting in G&T office
Putting Tenants First - Future Proofing Sustainable Spaces for Life Sciences
Back
G&T employee with Apprentice
Building future skills at Broadgate
Find out more
Back
Soldiers Adobe Stock 39369548
Why the built environment provides a great career path for military leavers
Discover more
IT engineer installing hard drive into server rack

Data Centre Fit-Out

Refurbishment of areas in data centre facility to accommodate high density customers and tie these areas back to the new enhanced power infrastructure which will support these spaces with centralised cooling and standby power, resulting in a much-improved PUE when compared to the existing facility.

The works required significant building and technical refurbishment works.

  • Level 1 1.35MW Data Hall
  • Level 2 2.25MW Data Hall
  • Level 8 3.6MW Data Halls
  • Level 9 3.6MW Data Halls

The scope of works included demolition of existing data halls together with construction of new data halls including new wall layouts, finishes and protection, strengthening of of existing structure for enhanced loads such as battery rooms as well as additional bracing and accommodating level changes within the building to suit new layout.

Client

Confidential

Location

London

Next Project

Data Centre 30MW

View Project
Copy the URL below and share: