С»ÆѼÊÓƵ

Back
Insights
Employees sitting in G&T office
Putting Tenants First - Future Proofing Sustainable Spaces for Life Sciences
Back
G&T employee with Apprentice
Building future skills at Broadgate
Find out more
Back
Soldiers Adobe Stock 39369548
Why the built environment provides a great career path for military leavers
Discover more
Paul Young Energy Centre - exterior of building

Paul Younger Energy Centre

The new Paul Younger Energy Centre is one of the projects driving emissions reductions for South Tyneside Council for its target of net zero carbon operations by 2030.

The building will house a two stage 450kw air to water source heat pump which will take ambient heat from the air and converting it into low-temperature-hot-water to provide reliable lower carbon heating.

Air source heat pumps will minimise the use of traditional, gas-fired boilers, enabling the project to deliver carbon savings of approximately 319 tonnes per year.

Client

South Tyneside Council

Location

Hebburn

View all projects on map

Next Project

Future Biogas

View Project
Copy the URL below and share: